§ 14-94. Water impact study and water impact study report.  


Latest version.
  • The water impact study required by this article shall be conducted by two certified hydrologists holding a Ph.D. in the field, and approved by the town board. The costs associated with conducting the water impact study, as well as the costs of preparing and submitting the water impact study report to accompany a building permit application, shall be borne, in their entirety, by the prospective applicant for a building permit.

(Prior Code, § 8-7-7)