Waukesha |
Code of Ordinances |
Chapter 20. LAND DIVISIONS |
Article V. CERTIFIED SURVEY MAPS SUBMITTAL REQUIREMENTS (MINOR LAND DIVISIONS) |
§ 20-147. Required information.
The following information shall be required:
(1)
Date of the map.
(2)
Insert showing map of area with property location.
(3)
Graphic scale and north arrow.
(4)
Name, address and daytime phone number of the owner, subdivider and land surveyor.
(5)
All existing structures, including square footage and horizontal offset to existing and/or proposed property lines, visible and known wells, watercourses, drainage ditches, existing property lines of abutting property, and other features pertinent to proper division.
(6)
Name of adjoining streets, highways, parks, cemeteries, subdivisions, ponds, streams, lakes, flowages, and wetlands.
(7)
Additional setbacks or building lines required by the town plan commission which are more restrictive than the regulations of the zoning district in which the plat is located or which are proposed by the subdivider and are to be included in recorded protective covenants.
(8)
Additional setbacks or offsets proposed by the subdivider which are more restrictive than the regulations of the zoning district in which the plat is located.
(9)
All lands planned for future public acquisition.
(10)
Floodplain limits of the 100-year recurrence interval flood as determined by the Federal Flood Insurance Study or other technical document, or where such data is not available, the elevation shall be determined by a registered professional engineer and the sealed documents shall be subject to the review and recommendation of approval of the town engineer and the approval of the town. The contour line lying a vertical distance of two feet above the elevation of the 100-year recurrence interval flood, or where such data is not available, the elevation shall be determined by a registered professional engineer and the sealed documents shall be subject to the review and recommendation of approval of the town engineer and the approval of the town within the exterior boundaries of the plat.
(11)
Easements shall be shown on the certified survey map and shall be limited to utility easements, drainage easements, conservation easements, access easements, scenic easements, mineral easements, or air rights easements. Easements shall not be used for the conveyance of street rights-of-way, pedestrian rights-of-way, park or school lands, or other public lands requiring dedication.
(12)
Exact length and bearing of the centerline of all streets.
(13)
Exact street width along the line of any obliquely intersecting street.
(14)
Railroad rights-of-way within and abutting the plat.
(15)
A drainage and grading plan for all lots on the map bearing a statement concerning the relation of all drainage swales, ponds, or other facilities. Grading plan for the proposed land division extending 150 feet from the proposed property lines.
(16)
Special restrictions required by the town plan commission and any other approving or objecting agency relating to access control along public ways, the provision of planting strips, to preservation of wetlands, to more restrictive yard requirements, or to special restrictions for environmentally significant lands.
(17)
Location, area, depth, and type of the soil absorption waste disposal system for each building site, if applicable.
(18)
Delineation of all conservancy zoning district lands, wetlands and shoreland/wetlands based on a field staking by the U.S. Army Corps of Engineers, the Wisconsin Department of Natural Resources (WDNR), the southeastern state regional planning commission, or other agency or firm certified to make such delineation by the federal government or the Wisconsin Department of Natural Resources (WDNR).
(Ord. of 9-8-2017, § 12-7-2)