After the installation of all utility and stormwater drainage improvements, the subdivider
shall surface all roadways in streets proposed to be dedicated, to the widths prescribed
by these regulations and the adopted town comprehensive plans, adopted plan components, chapter 12, article II, and chapter 36, articles I and III. Said surfacing shall be done in accordance with plans and standard
specifications approved by the town, upon the recommendation of the town engineer
and adopted by the town board or its authorized agents. The second lift of asphalt
shall not be installed less than one year nor greater than three years after base
course pavement is installed for a given phase.
(Ord. of 9-8-2017, § 12-9-4)